I finished knitting the Spring Shawl-it blocked out to 54" wide and 27" deep. The Shetland has block out to be just a whisper of yarn-very sheer feeling! This is proof to my family that I have been taking a lot of down time!
I tried to get Nyki to model it for me and she wasn't cooperative! (as usual)
I spent a bit of time moving all the supplies from the corner of the sewing room so that we could finish the flooring under the washer and dryer.
I could only be on my feet for short bouts so I sat and did some piecing in the down time. My sewing machine works by button only, if desired, and so I could keep my foot up as I pieced-awkward but better than being grounded on the couch the whole day!
Bill worked in the garden and the yard-here is his potato crop.
Then in the afternoon, he came in and tackled the corner!
We got the flooring in, hooked the washer and dryer back up and then set up the shelves!
I got most of the supplies into a cubby and will do some more sorting when I can stand longer! (I think I will be buying another row of cubbies to go up the outside row of shelves.)
It looks very inviting in here now! It was a long day but worth a little swelling!