The pools guys put in a long day today. They repaired some rain wash out and then finished the leveling.
They bent down all the re-rod steel -it sure did make a difference to see them laying down!
The forms were made for the steps outside of the sliding glass doors.
And around the areas that will be used for plantings.
While all the fun was going on outside, Bill finished up the plumbing.
We will have a shower after inspection!
We have door knobs on the closet doors, too!
I was holed up in the sewing room doing this.
Subscribe to:
Post Comments (Atom)
A DAB OF PAINT
I am enjoying the acrylic paint-by-number projects. As with most things, the second one (the bottom one) was much easier to do; I have...
-
Oh, I love to see these throughout daughter' yard! The prednisone has been great to give me a boost; a boost so good that I haven...
-
The quilting was finished on this quilt and then I spent a lot of time making bindings yesterday. I hope to apply them for some finishes ...
-
I cut up all of the latest Fat Quarter Club fabrics paired with some of my own solids for these 9 patches. It was fun to dig through the sol...
I couldn't figure out why the pool looked so different in the first picture -- the second picture explained it.
ReplyDeleteCan you imagine, two full bathrooms to use while we're all there -- yippee! :)
Your sewing accomplishments are lovely...everyone will be thrilled!
Those dresses are precious!!!
ReplyDeleteThe pool is coming along nicely. I can hardly wait to see what it looks like after concrete is poured and the deck is in place.
Pretty fabric. Abigail is to be the beneficiary, I assume?
ReplyDeleteThe dresses and ties are beautiful, and you're making lots of progress on the remodel and pool!
ReplyDeleteGreat household progress!! It's finally warm enough here that I can almost imagine swimming in a pool.
ReplyDeleteThe dresses are great! I love the fabric and ties.
Sue