We woke up to a light rain this morning....
the weather men were conferring over the conditions.
In the background, you can see the Magnolia tree.
It is a towering giant in the front yard.
Bill picked me a tight bud last night; this morning it was beginning to open.
By 9am, it was fully open and it was a heady aroma!
(When I came home 4 hours later, my room was and still is delicious smelling!!!!)
During visit time, I sat in the car during the drizzling weather. I worked on a sock.
I ran into a knot, rudely placed interrupting the flow of the stripes! Grrrr. I rolled ahead and found the right spot to continue the pattern.
I bound off during the dinner prep waiting time in the evening.
Technical stuff--I tried some new things with this sock;
I started the toe with 14 stitches instead of 12
then worked up to 60 stitch count on 2.5mm needles
when I hit the heel position, I slipped three stitches on each end of the front needle to the back so that instead of the usual use of half of the stitches for heel stitches,
because I increased the count to 60% of the stitches so
I worked the heel over 36 stitches in this instance.
I worked a short row heel and that was straight forward.
The fit is nicer I think and I will be doing this on all future socks.
(there was more room in the heel area and it wasn't so tight.)




















































