Tuesday, January 10, 2023

TIME TO SEPARATE!

The count stayed perfect all through the increases
 and when it was long enough, it was time to put the sleeves
 on stitch holders (yarn) while I power on down the body! 
 It's nice to have this sweater working right!


 

5 comments:

  1. I am sitting here wearing the rattiest old raglan you could ever imagine but it's so big and comfy on a cold morning that I can't bear to part with it. I really need to get a replacement on the needles. I love whatever that yarn is doing color-wise. You are tempting me.

    ReplyDelete
  2. That is going to be a great sweater. I'm still knitting away on my Portage sweater. It's a lot of back and forth with increases every 14 rows as you work down the body. I'm on the ribbing now so it won't be long before I start the sleeves. I really don't think I'll get it done before I leave though. Bummer.
    Blessings,
    Betsy

    ReplyDelete
  3. Love the stripes the yarn is creating!

    ReplyDelete
  4. Looks like you are moving right along. My crojo, craft mojo is non-existent at the moment even though I wanted to make something every day.

    ReplyDelete

Thanks for taking the time to let me know you stopped by to read my blog! If you can't get the blog to accept a comment-email me! If you don't have a blog yourself, use my email so I can then email you back-I love to respond to those who leave comments! Thanks!

GLOWING WORK!

The two layer cake scrambled tops are finished!   The dimensions are 40 50".   I have the backing so they will be heading to the frame ...